Popular Topic
Building Rehabilitation Workflow
Building Maintenance Grant Scheme for Needy Owners
Sample Documents
Download Centre
Mandatory Building Inspection Scheme
Service Providers Directory
Building Maintenance Grant Scheme for Needy Owners (BMGSNO)
Download Centre
Operation Building Bright 2.0
How is the ceilings of the average annual rateable value of all the domestic units mentioned in the eligibility criteria under “Water Safety Plan Subsidy Scheme” calculated?
Online application(New)
URA CSW Office
Building Rehabilitation Resource Centre
Construction Industry Council
Building Drainage System Repair Subsidy Scheme
Quotation seeking document and contract for window inspection and repair for individual unit (with explanatory notes)(Chinese version only)
Cost Reference Centre
E-tendering Platform
Reference Unit Rate
Second Round Lift Modernisation Subsidy Scheme
Alhambra Building
Yau Tsim Mong
Address
383-389C Nathan Road & 15-17 Kansu Street
Year Built
1960
Total no. of Units
282
Year of Substantial Works Completion
2012
Approximate Cost of major works
HK$ 9,070,000
Average cost per Flat
HK$ 32,100
Major Scope of Works:
- Concrete Repair
- External Wall Re-painting
- Internal Wall Re-painting
- Replacement of Drainage Pipes
- Replacement of Fresh Water Pipes
- Replacement of Flushing Water Pipes
- Re-roofing for Main Roof
- Removal of Unauthorized Building Works
- Fire Services Installation Improvement
- Replacement of Fire Rated Doors
- Replacement of Windows
- Remarks:
- The above information is for general reference only. No express or implied warranty is given to the accuracy or completeness of the above information or its appropriateness for use in any particular circumstances. URA is not responsible for any loss or damages whatsoever arising from any cause whatsoever in connection with the above information or with this web site. URA reserves the right to make any amendment to the above information.