Skip to main content

 

Integrated Building Rehabilitation Assistance Scheme Application Forms

 

Application Forms - Building Safety Loan Scheme Note 1
(Applicable to Individual Flat Owner to apply) 

 

Note 1:
To align with the Joint Office's "Pilot Scheme of Enhancing the Inspection and Testing Procedures for Handling Water Seepage in Buildings" (hereinafter referred to as the Pilot Scheme), the Building Safety Loan Scheme has introduced a "Provisional Approval Procedure" to expedite the processing of loan applications related to the Pilot Scheme. Specifically, upon the applicant signing all required documents and providing the necessary guarantees, an initial provisional loan amount (not exceeding 30% of the provisional loan amount) will be disbursed to the applicant to assist them in carrying out the relevant building water seepage inspection and testing procedures.  To obtain the Application Form and Application Notes for the Pilot Scheme, please visit the relevant website of the Buildings Department.

 

 

Download Sample Documents Under Subsidy Schemes

 

 

  • FAQ for signing Subsidy Agreement for elderly owner-occupiers and owner-occupiers

Building Rehabilitation Platform - Introduction

  • Introduction of Building Rehabilitation Platform (Chinese version only)

 

Building Rehabilitation Company Registration Scheme - Briefing

 

Building Rehabilitation Company Registration Scheme - Consultation Forum

 

 

Registered Fire Service Installation Contractors (Class 1 and 2) (23 July 2021)

 

Registered Minor Works Contractors (Company) (Class I) (6 July 2021)

 

Registered General Building Contractors (5 & 6 Aug 2019)

 

Registered Minor Works Contractors (Company) (Class I) (15 & 29 July 2019)

 

Registered Authorized Persons/ Inspectors (5 July 2019)

 

Registered Fire Services Installation Contractors (2 July 2019)

 

  •  On-line briefing for "Operation Building Bright 2.0" & "Pre-qualification list for Contractor" on 27 April 202 (Chinese version only)

 

  • On-line briefing for "Operation Building Bright 2.0" & "Fire Safety Improvement Works Subsidy Scheme" on 3  April 2023 (Chinese version only)

Part 1: Briefings on "Operation Building Bright 2.0" & "Fire Safety Improvement Works Subsidy Scheme" and points to note - Urban  Renewal Authority

 

Part 2: Briefing on Mandatory Building Inspection Scheme (MBIS) and points to note- Buildings Department 

 

Part 3: Scope of Works Covered by the Subsidy and Workflow for Complying the Fire Safety Direction - Fire Services Department & Buildings Department 

 

Part 4: Powers and duties of an Owners' Corporation (OC) and Management Committee (MC) and points to note for procurement - Home Affairs Department 

 

Part 5: Briefings on RenoSafe Scheme, integrity maintenance and corruption prevention, Competition Ordinance and how to prevent bid-rigging and points to note- Hong Kong Police Force, ICAC and Competition Commission

 

  • Online Briefing of Building Drainage System Repair Subsidy Scheme on 30 April 2021 (Chinese version only)

  • E-tendering Platform for Building Drainage System Repair Subsidy Scheme on 27 April 2021 (Chinese version only)

  • On-line Briefing for 2nd Round Lift Modernisation Subsidy Scheme on 4 August 2020 (Chinese version only)

Briefing on Modernising Existing Lifts & 2nd Round Lift Modernisation Subsidy Scheme (Chinese version only)

 

  • On-line briefing for "Operation Building Bright 2.0" & "Fire Safety Improvement Works Subsidy Scheme" on 23 July 2020 

Part 1: Briefings on "Operation Building Bright 2.0" & "Fire Safety Improvement Works Subsidy Scheme" and Reminder Notes - Urban Renewal Authority 

 

Part 2: Briefing on Mandatory Building Inspection Scheme (MBIS) - Buildings Department 

 

Part 3: Scope of Works Covered by the Subsidy and Workflow for Complying the Fire Safety Direction - Fire Services Department & Buildings Department 

 

Part 4: Powers and duties of an Owners' Corporation (OC) and Management Committee (MC). How to convene an OC and MC meeting - Home Affairs Department 

 

  • Mass briefing on 18 Apr 2019 (Please refer to Chinese webpage)

  • Mass briefing on 17 May 2019 (Please refer to Chinese webpage)

  • Mass briefing for Lift Modernidation Subsidy Scheme

 

Public may inquire Building Maintenance Assistance Scheme Hotline at 3188 1188 for further information.

 

  • Mass briefing on Jul-Aug 2018 for Operation Building Bright 2.0 & Fire Safety Improvement Works Subsidy Schemeon Subsidy Scheme2.0

Briefings on "Operation Building Bright 2.0" & "Fire Safety Improvement Works Subsidy Scheme" and Reminder Notes - Urban Renewal Authority

 

Operation Building Bright 2.0 (OBB 2.0) -Briefing on Mandatory Building Inspection Scheme (MBIS) - Buildings Department

 

Scope of Works Covered by the Subsidy and Workflow for Complying the Fire Safety Direction - Fire Services Department  & Buildings Department

 

Powers and duties of an Owners' Corporation (OC) and Management Committee (MC). How to convene and OC and MC meeting - Home Affairs Department

 

  • Mass briefing on Feb-Mar 2018 for Operation Building Bright 2.0 & Fire Safety Improvement Works Subsidy Schemeon Subsidy Scheme2.0

Brief on scheme details and application requirements - Urban Renewal Authority

 

Brief on Mandatory Building Inspection Scheme (MBISS) - Buildings Department

 

Scope of required and eligible works covered by Fire Safety Improvement Subsidy Scheme - Fire Services Department  & Buildings Department

 

Formation of an Owners' Corporation and relevant supporting service - Home Affairs Department

 

Integrity Building Maintenance - Independent Commission Against Corruption

 

The Competition Ordinance and prevent bid rigging - Competition Commission

 

Brief on RenoSafe Scheme - Hong Kong Police Force